![]() The CV-22 is equipped with integrated threat countermeasures, terrain-following radar, forward-looking infrared sensor, and other advanced avionics systems that allow it to operate at low altitude in adverse weather conditions and medium- to high-threat environments. This modification provides for additional repairs in support of the V-22 Common Configuration Readiness and Modernization program. Those capabilities give this versatile, self-deployable aircraft the capability to conduct missions that would normally require both fixed-wing and rotary-wing aircraft. Bell Boeing Joint Project Office, Amarillo, Texas, is awarded a 10,178,059 modification (P00029) to a previously awarded, fixed-price-incentive-firm-target, cost-plus-fixed-fee contract (N00019-17-C-0015). Like the MV-22 Osprey, the CV-22 is a tiltrotor aircraft that combines the vertical takeoff, hover, and vertical landing qualities of a helicopter with the long-range, fuel efficiency and speed characteristics of a turboprop aircraft. NIIN 015209455 - NSN Parts Sourcing ASAP Aerospace Send Instant RFQ Home NIIN Parts 015209455 NIIN 015209455 - NSN Parts At ASAP Aerospace, we have top parts such as Control Ay Nacelle from premium manufacturers including Bell Boeing Joint Project Office, Guardian Electric Co Inc, The Boeing Company and more. The CV-22’s mission is to conduct long-range infiltration, exfiltration and resupply missions for special operations forces. Air Force Special Operations Command (AFSOC) variant of the U.S. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Navy) funds in the amount of $13,500,000 will be obligated at the time of award, none of which will expire at the end of the current fiscal year. Air Force) funds in the amount of $168,676,913 and fiscal 2021 aircraft procurement (U.S. Work is expected to be completed in March 2025. ![]() Additionally, this modification provides for post-production repairs in support of the MV-22B Common Configuration Readiness and Modernization Program for the Navy. Historical Federal Obligations Awarded to Bell Boeing Joint Project Office Total: Range: Max. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.Bell-Boeing Joint Project Office, Amarillo, Texas, is awarded an $182,176,913 modification (P00039) to previously awarded, fixed-price incentive (firm target), cost-plus-fixed-fee contract N00019-17-C-0015 for the production and delivery of two CV-22B variation in quantity aircraft for the U.S. ![]() Fiscal 2020 aircraft procurement (Navy) funds in the amount of $45,287,445 fiscal 2020 operations and maintenance (Navy) funds in the amount of $473,200 fiscal 2019 aircraft procurement (Navy) funds in the amount of $29,263 fiscal 2018 aircraft procurement (Navy) funds in the amount of $249,893 fiscal 2018 aircraft procurement (Air Force) funds in the amount of $8,039 and Foreign Military Sales funds in the amount of $2,233 will be obligated at time of award, $731,132 of which will expire at the end of the current fiscal year. Work will be performed in Ridley Park, Pennsylvania (91%) and Fort Worth, Texas (9%), and is expected to be completed in March 2022. MoD)Īdditionally, this modification procures new tooling in support of V-22 production, supports life of type buys for the anti-collision light system power supply, lamp drive control display unit and enhanced standby flight instrument, modifies government-owned tools and provides for future CC-RAM in-service repair support as well as production systems engineering and program management support for the Navy, Air Force and the government of Japan. MV-22B Ospreys arrive at Marine Corps Base Hawaii, (Picture source: U.S. Navy.įollow Air Recognition on Google News at this link This modification exercises options in support of the V-22 Common Configuration-Readiness and Modernization (CC-RAM) effort and upgrades three MV-22 Osprey aircraft from a Block B to Block C configuration in support of the U.S. Bell-Boeing Joint Project Office, Amarillo, Texas, is awarded a $46,050,075 modification to previously awarded cost-plus-fixed-fee, fixed-price-incentive-firm-target, firm-fixed-price contract N00019-17-C-0015.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |